How lng is a Piece of String
summary
Estimation is hard and repeated practice alone does not reliably improve accuracy; research on the Agile Alliance shows relative estimation using story points has no proven advantage over absolutes. Small, well-scoped items are consistently easier to estimate, while hidden complexity breaks estimates for larger items. Recommended reads are Software Estimation and Waltzing with Bears for risk-focused techniques. Practical fix: adopt sizing buckets or LunaLogic story point cards and split anything that lands in the “too big / no clue” bucket.
AI-written summary · about
related talks
20mHow long is a piece of string? Solving the conundrum of software estimation
01h 00mEstimation: The Art of the SWAG
48mRespect estimates
01h 45mEstimates or NoEstimates
46mEstimates and complexity: a tale in 42 and a half minutes
29mSoftware estimation – embracing nuance and controlled chaos
40mEstimations: from guessing to weighing in grams
57mThe Science of not estimating
