How Grid Operators Can Unlock Asset Flexibility - Integrating...
summary
A production-ready plugin connects FlexMeasures as an OpenADR VEN to an OpenLEADR VTN so DSOs can publish day‑ahead congestion slots that become kilowatt sensor inputs in the EMS; the optimizer enforces those dynamic limits, shifting heat‑pump schedules and curtailing EV charging on a demo campus with chargers, PV and base load. Implementation uses LF Energy open-source stacks (OpenADR libraries), the plugin is on GitHub and the demo shows schedules change to respect the announced caps.
AI-written summary · about
chapters (8)
- 0:00Introduction to LF Energy projects
- 2:09Dutch DSO congestion problem
- 6:06Open ADR standard overview
- 10:19Flex Measures cloud EMS
- 12:05Open Leader virtual top node
- 15:59Integration with Flex Measures
- 18:10Demo setup and live demo
- 29:13Takeaways and Q&A
related talks
43mMore Renewable Energy Into the Power Grid with Open Source
30mRust Meets the Grid: Building Openleadr-rs for Real-World Demand Resp...
27mOpen-Source Congestion Mana...
38mOpen Energy Modeling for Mission-critical Planning Purposes
13mLightning Talk: Open-source Cutting Edge Algorithms for Mod...
26mWhy a Distribution System Operator Is Investing in Open Source
34mOpen Source Metering Will Transform How We Modernize the Grid
30mHow Open Source Helps a Grid Operator with the Challenges of...
