VendorDome: Reaching Peak Productivity in Production
summary
Claims that elite performers now match deploy frequency with recovery speed per the DORA report, backed by concrete engineering changes: moving from nine‑month ship cycles to same‑day deploys, reducing local setup from a 22 GB clone and long prereq installs to a 15 seconds dev box, and productizing virtualized container environments. Demoed metrics include first‑week production deploys and a shrink from days to hours for onboarding, with those changes reported as working in production at GitHub and LaunchDarkly.
AI-written summary · about
chapters (3)
related talks
45mBuilding and Scaling High Performing Technology Organizations
30mThe Data Behind DevOps: Becoming a High Performer
33m7 habits of a high performing team
30mBuilding Applications in the Cloud: Best Practices
34mDevOps: Next
35mAre We There Yet? Signposts On Your Journey To Awesome
29mRobust delivery with CI/CD
54mDeveloper Productivity Engineering Deep Dive
