What a product team must do BEFORE a full system blackout
summary
A CDEK engineering team shares practical pre‑blackout preparations for enterprise systems, describing what must already exist in code and in engineers' minds before a full system outage. The talk covers concrete readiness measures and lessons learned from building their enterprise from scratch in late May, including specific tooling, safeguards, and practices to survive a complete blackout.
AI-written summary · about
chapters (10)
- 0:00Introduction
- 2:16Five system recovery stages
- 10:46Preparing for system outage
- 16:01Step-by-step system recovery
- 22:01Resilient architecture traits
- 29:05Master data recovery
- 32:34Team allocation and tasks
- 34:18Post-failure data propagation
- 39:07Incident outcomes and takeaways
- 47:16Q&A
related talks
10mDecision making in black box scenarios
14mDisaster Recovery preparedness
15mIncident Ready: Chaos Engineer Your Incident Response
03mDeveloping a Chaos Architecture Mindset
17mMinimum viable business continuity planning
27mChaos Engineering: The Path to Reliability
48mChaos Engineering Panel
16mEngineering Failure-Resilient Systems
