Reldex: scoring the efficiency of app release cycles
summary
Reldex defines a single release-process score built from six metrics (overall time to release, time to stabilize, stage rollout time, hot fixes during rollout, days since last release, days between release and hot fix) with default scoring where overall time to release is 10–12 days default and carries a 20% weight, metric scores are 1/0.5/0, final grade thresholds use >0.75/0.5–0.75/<0.5, scoring is calculable in a provided Google Sheet and released under an Apache license for integration into Tramline or internal tools.
AI-written summary · about
related talks
15mDev Team Metrics that Matter
31mThe four key metrics, Unleashed!
24mFuture-proofing your Android release process
22mFrom Chaos to Control: Future-Proofing Your Android Release Process
21mFrom chaos to control: Future-proofing your Android release process
20mMobile DevOps Performance, Productivity, and Maturity: how do YOU compare?
39mDev Team Metrics that Matter
44mEnhancing the Performance of Engineering Teams
