~/talk

CRA compliance implications (Article 13)

links:none on file
slides:none on file

Article 13 makes risk assessments, documented technical files and a defined support period reflects product lifetime mandatory, often meaning 5–15 years for devices like HVAC; manufacturers must generate SBOM snapshot and use software composition analysis with reachability/exploitability scoring rather than raw CVSS; third‑party modules and SDK swaps force firmware revisions and retesting; cloud back‑ends and mobile apps can pull products into scope; EN drafts (Annex 1 mapping) and PT2 gap analyses offer concrete steps to meet vulnerability‑handling and secure‑by‑design requirements.

AI-written summary · about

  1. 0:00Introduction to CRA compliance
  2. 1:03Article 13 and its impact
  3. 2:51Risk assessment and support period
  4. 5:20Support period expectations
  5. 6:23Supply chain and vulnerability handling
  6. 8:49Physical components and CRA
  7. 10:33Supplier discussions and compliance
  8. 12:20Joint development and documentation
  9. 13:44Annex 1 and secure design
  10. 15:27EN standards and compliance gaps
  11. 17:11Remote data processing solutions
  12. 18:13AI and compliance challenges
  13. 18:55Business challenges and next steps
~/search
type to search 8,222 conferences, 162,397 speakers and 219,688 talks
~/help
cmdctrl k
search every conference, speaker and series
/
focus the filter search
h
home
c
conferences
s
speakers
e
series
t
light / dark — the status bar button does the same
← →
on a talk: 5 seconds back / forward
0–9
on a talk: jump to 0%–90% of the recording
?
this help
esc
close this, then clear every filter — or just the search, while you are typing in it

Ignored while you are typing. Pages without a filter rail have no search to focus.