Rocket Science and Software Engineering (Keynote)
summary
Space missions fail for mundane software reasons and measurable mistakes: a transcription error in Mariner 1 costs $18.5 million, reusing Ariane 4 code causes an overflow from 64-bit float into a 16-bit int and destroys a rocket (~$370M), unit mismatch (lbf vs N) burns up Mars Climate Orbiter (~$327.6M), a milliseconds-long negative attitude leads Schiaparelli to cut thrusters and hit at 3.7 km. The remedy is concrete: unit-tested formulas, integration tests, CI, code reviews, and constrained flight‑grade hardware and staged over‑the‑road updates.
AI-written summary · about
chapters (35)
- 0:00Introduction
- 3:30About Carina Haupt
- 3:58German Aerospace Center DLR
- 4:35Transport
- 5:14Space
- 5:46Research
- 6:47Software Development
- 7:38Software Engineering
- 8:20Proper Software
- 9:58Marina 1 failure
- 11:45No tests
- 12:24Errors
- 14:03The Story
- 14:50The Consequences
- 16:43Missing Tasks
- 16:56Mass Polar Lander
- 17:41Mars Climate Orbiter
- 19:16Super Ally
- 21:00Crash
- 22:32Missing Requirements
- 22:45Wrong Location
- 23:47Burning Up in Earths Atmosphere
- 24:11The Answer
- 24:28Mistakes
- 25:07Human error
- 25:21What to expect
- 26:29Old technology
- 29:12Trainings
- 33:05Frameworks
- 34:20Mass notation
- 35:08Certification
- 37:17Learning from others mistakes
- 39:16Is NASA still using the metric system
- 40:06SpaceX
- 43:02Open Source
