QA Stages in Release Pipeline at Dashlane
summary
QA moves into development branches so merge requests run a blocking smoke subset and only green pipelines trigger a full regression subset before merging; automation consultants sit inside each agile team and automation lives in GitLab CI integrated with Xray for visibility. Most tests are dockerized (except mac/iOS), visual checks use Percy, load tests use Gatling and Puppeteer, and LambdaTest provides burst capacity—one recent run prepares for 1M visits per minute. Result: lower master maintenance, faster failure detection, build times ranging ~20–40+ minutes.
AI-written summary · about
