Josh Perkins, AHEAD | NVIDIA GTC 2026
summary
AHEAD builds and certifies turnkey AI infrastructure: a 10-megawatt liquid-cooled facility outside Chicago plus a Foundry network that tests, benchmarks and ships racks with NVIDIA, Dell, Cisco and others. The operation pairs hardware builds with software, security and developer tooling so GPU clusters become consumable and operationalized for production. The org scales engineering rapidly—about 2,400 engineers on client sites—and reports ~70% of customers treating AI as existential, shifting proofs into production in weeks.
AI-written summary · about
