Mike Taylor, U.S. Navy | Nutanix .NEXT 2025
summary
Hospital ships run a 1,000‑bed hospital with up to 1,200 people and migrate production VMs from VMware ESXi to Nutanix AHV using Nutanix Move and live migration, deploying two Nutanix clusters that fail over for continuity. Migrations on Mercy (2019) and Comfort (2020) move ~80 VMs with two or three stubborn VMs fixed on-site, systems survive salt‑water intrusion and cooling constraints, and VDI, NDB and GPU-backed flash are next targets.
AI-written summary · about
