Q&A Session 2 – Andrey Golovanov
summary
Aluminum subsea cable math: aluminum is 61% as conductive as copper, 30% of the weight and 25% of the price, so cables use more aluminum to match resistivity and end up ~50% lighter and ~60% cheaper while cutting ohmic losses that today consume ~50% of subsea power. Typical project timelines run 4–6 years due to seabed surveys and permits; unmanned survey boats like Saildrone are being trialed. Operations use CLI, TL1 and netconf; migrations mean coordinated capacity moves across endpoints with synchronized scheduling. Control plane resilience uses geo blast‑shield partitioning, per‑geo controllers and dual‑vendor roles often running Sonic.
AI-written summary · about
chapters (13)
- 0:00Session introduction
- 0:47Aluminum vs copper in subsea cables
- 2:55Subsea capacity growth limits
- 4:43Subsea cable project timelines
- 5:50Unmanned vehicles for subsea surveys
- 7:13Subsea industry change speed
- 8:21CLI parsing for network devices
- 10:48Optical network migrations
- 13:36Glass Shield for controller outages
- 15:43Internet traffic engineering with WAN
- 17:50Scaling with layered architecture
- 20:42Vendor diversity in networks
- 22:30Session wrap-up