~/talk

John Hewitt & Josh Claman, Accelsius | F1 Capital Factory 2026

Talkat F1 Capital Factory 26 · on Monday, 2026-10-26· [cloud-infrastructure]
links:none on file
links:none on file
slides:none on file

Accelsius describes a working two-phase phase-change cooling system that replaces single-phase water plates to capture far more heat at high flux, enabling racks to move from tens of kilowatts to 600 kilowatt racks and beyond while reducing water use. A modular product line spans closet-sized inference pods to multi-megawatt AI factories, developed by PhDs co-designing with silicon vendors and OEMs. Efficiency gains free power for compute and convert to roughly $60 million per 100 megawatts in additional revenue.

AI-written summary · about

  1. 0:00Accelsius Two-Phase Cooling for AI Factories
  2. 3:42Scaling Water-Efficient Cooling for AI Racks
  3. 5:55Accelsius Accelerates Compute Through Efficient Cooling
  4. 9:47Collaborative Systems Engineering for Data Centers
  5. 12:45Adapting Cooling to Evolving AI Infrastructure
  6. 16:18Scalable Cooling for AI Factory Efficiency
  7. 19:20Separating Intelligence Infrastructure From AI Applications
~/search
type to search 8,222 conferences, 162,397 speakers and 219,688 talks
~/help
cmdctrl k
search every conference, speaker and series
/
focus the filter search
h
home
c
conferences
s
speakers
e
series
t
light / dark — the status bar button does the same
← →
on a talk: 5 seconds back / forward
0–9
on a talk: jump to 0%–90% of the recording
?
this help
esc
close this, then clear every filter — or just the search, while you are typing in it

Ignored while you are typing. Pages without a filter rail have no search to focus.