~/talk

How to Keep Requirements Under Control When Developing an Electric Vehicle

TalkinRussianat DUMP 2026 Saint Petersburg · on Friday, 2026-02-13· [software-architecture]
links:none on file
slides:none on file

Describes managing requirements for electric vehicle development by using a single requirements model made of atomic objects of different types linked by relationships. Argues that this linked, atomic-object approach keeps control over prioritization and development directions even for complex EV projects with extensive IT features.

AI-written summary · about

  1. 0:00Introduction
  2. 2:55EV as software-defined product
  3. 6:30Interconnected components challenges
  4. 8:58Safety and certification constraints
  5. 11:27Requirements traceability matrix
  6. 13:58Atomic requirements lifecycle
  7. 16:31Structured requirements benefits
  8. 18:36Handling changes and suppliers
  9. 21:08Release and certification planning
  10. 23:46Q&A
~/search
type to search 8,222 conferences, 162,397 speakers and 219,688 talks
~/help
cmdctrl k
search every conference, speaker and series
/
focus the filter search
h
home
c
conferences
s
speakers
e
series
t
light / dark — the status bar button does the same
← →
on a talk: 5 seconds back / forward
0–9
on a talk: jump to 0%–90% of the recording
?
this help
esc
close this, then clear every filter — or just the search, while you are typing in it

Ignored while you are typing. Pages without a filter rail have no search to focus.