Initiating and Adopting Enterprise Design Systems
summary
Company builds an internal design system called Forge 1.0 and runs pilots and an early-adopter program (about five teams) to validate components. Decision: use a React implementation for prebuilt components rather than purely tech-agnostic HTML/CSS. Backlog prioritizes roughly 40 core components (atoms/molecules), buys complex items like a datagrid, and uses GitLab-style pull requests for contributions. Success metrics tie to production usage with targets of 15% Q2 / 50% year-end and design-quality scores (Nielsen heuristics + Forge adherence).
AI-written summary · about
chapters (16)
- 0:00Introduction and context
- 1:27AthenaHealth design system goals
- 2:52Enterprise challenges and needs
- 5:19Design ops and team structure
- 13:55Consultant collaboration and roadmap
- 14:41Design system team roles
- 17:27UX engineering and technology choice
- 23:57Pilot program and backlog building
- 29:17Adoption strategies and change management
- 36:17Governance and guiding principles
- 41:57Contribution process and open model
- 46:12Measuring success and metrics
- 51:16Overcoming design and technical debt
- 56:00Maintaining and scaling the system
- 58:12Regulatory and IT considerations
- 1:00:00Q&A and closing remarks
