Stephen Ewe Hock Teck | TM One | Session at DCCI 2022- Malaysia
summary
Data center demand in Malaysia grows from ~120 MW today to ~150 MW by year end and could reach 600–800 MW within 5 years, driven by hyperscalers requiring minimum 2 availability zones and regulatory backup for BFSI. Operational levers include rainwater harvesting, aisle containment and motion-sensor LED lighting, raising supply-air temps per ASHRAE to cut chiller load, buying renewable energy now, and a corporate goal of net-zero by 2050 with 45% target by 2030.
AI-written summary · about
