~/talk

Lessons from our Hardware on the ISS

Talkat Big Sky Dev Con 2026 · 2026-07-24..07-25· [embedded-and-hardware]
links:none on file
slides:none on file

Cambrian Works ships a custom Linux gig router to the ISS, survives nine months on the ground and a 50 W power budget, and runs with ~20 MB uplink windows; qualification uses lead solder, thermal‑vacuum, vibration and proton‑beam radiation tests. Four operational surprises shape the ops playbook: vanished SSD for 66 days, temperature spike from ISS orientation, UDP sent to wrong computer, and radiation readings distorted by temperature, leading to idempotent updates, safe defaults, richer logs, and test assumptions about dependencies.

AI-written summary · about

  1. 0:00Introducing the ISS Linux Hardware Mission
  2. 5:31Qualifying Hardware for Space
  3. 8:48ISS Orbit, Radiation, and Limited Connectivity
  4. 13:14Nine Months from Delivery to Power-On
  5. 15:33Surprise 1: A Vanishing SSD
  6. 19:01Surprise 2: Temperature Spike from ISS Orientation
  7. 20:58Surprise 3: UDP Commands Sent to the Wrong Computer
  8. 23:18Surprise 4: Misleading Radiation Readings
  9. 25:31Engineering Takeaways and Q&A
~/search
type to search 8,222 conferences, 162,397 speakers and 219,688 talks
~/help
cmdctrl k
search every conference, speaker and series
/
focus the filter search
h
home
c
conferences
s
speakers
e
series
t
light / dark — the status bar button does the same
← →
on a talk: 5 seconds back / forward
0–9
on a talk: jump to 0%–90% of the recording
?
this help
esc
close this, then clear every filter — or just the search, while you are typing in it

Ignored while you are typing. Pages without a filter rail have no search to focus.