Lessons from our Hardware on the ISS
summary
Cambrian Works ships a custom Linux gig router to the ISS, survives nine months on the ground and a 50 W power budget, and runs with ~20 MB uplink windows; qualification uses lead solder, thermal‑vacuum, vibration and proton‑beam radiation tests. Four operational surprises shape the ops playbook: vanished SSD for 66 days, temperature spike from ISS orientation, UDP sent to wrong computer, and radiation readings distorted by temperature, leading to idempotent updates, safe defaults, richer logs, and test assumptions about dependencies.
AI-written summary · about
chapters (9)
- 0:00Introducing the ISS Linux Hardware Mission
- 5:31Qualifying Hardware for Space
- 8:48ISS Orbit, Radiation, and Limited Connectivity
- 13:14Nine Months from Delivery to Power-On
- 15:33Surprise 1: A Vanishing SSD
- 19:01Surprise 2: Temperature Spike from ISS Orientation
- 20:58Surprise 3: UDP Commands Sent to the Wrong Computer
- 23:18Surprise 4: Misleading Radiation Readings
- 25:31Engineering Takeaways and Q&A