How Projected AR is Increasing Productivity in Construction
summary
A projection mapping system projects PDF drawings onto walls to mark sockets, sprinklers and fittings and cuts a floor mark‑out from 80 hours to 34.5 hours, saving 45.5 hours (about 57%). It uses DeltaSigma ProjectionWorks, creative MadMapper software, short‑throw projectors on portable rigs and a Surface tablet UI, attains TRL 7, and demonstrates clear ROI; limitations are sunlight, throw‑distance, an awkward operator UI and the PDFs not being live BIM so TRL‑8 needs broader on‑site scenarios.
AI-written summary · about
